Skip to main content

Table 2 PM performances

From: Event-based prospective memory performance in autism spectrum disorder

Tests

ASD

Controls

F-Value

η² p

M (SD)

M (SD)

(df)

PM task

Objective measures

prospective hits (accuracy)

.48 (.46)

.59 (.41)

.55 (1,36)

.02

prospective hits (reaction times in ms)

2140.25 (1443.1)

2021.18 (1273.5)

.05 (1,24)

.002

Subjective measure

DEX

41.54 (9.2)

21.64 (9.3)

43.89 (1,36)***

.55

  1. ***p < .001